For the DIY program, projects are designed and built by the homeowner with or without help from professional designers and contractors.
Eligible projects
Selecting the right project is important to ensure that it is effective at reducing stormwater runoff and pollutants.
- Rain gardens are depressed landscaped areas that collects rain water from roofs, driveways or streets and allows it to soak into the ground. Learn more about rain gardens.
- Permeable pavement is paving surfaces that allow stormwater runoff to soak through the surface and into the ground. Learn more about permeable pavement.
- Green roof is a roof that is partially or completely covered with vegetation, which allows rainwater to be absorbed. Learn more about green roofs.
- Rain barrels are barrels that capture runoff from roofs and hold it for later use, such as on lawns or gardens.
- The program will reimburse residents for the purchase of up to three rain barrels at a cost of $50 each rain barrel.
- Other innovative stormwater management practices
Step-by-step process
1. Select your type of project.
Select the type of project that best fits your needs.
2. Create a preliminary design and cost estimate.
Perform a site review to determine the most effective location and design your project. Keep in mind the following items when performing a site review to ensure the project will be effective:
- Soil types and potential infiltration rates. Additional infiltration field testing may be required.
- Drainage area and site characteristics
- Site constraints, such as underground utilities and easements
- Applicable permits for working within the city right of way, utilities, plumbing, electrical or erosion control
If you need assistance with site review and design, Blue Thumb Partners provides a list of local designers and contractors that have experience with storm water management design and construction.
It is recommended that a qualified designer or engineer perform a detailed site review.
Next, you will create a cost estimate.
After the site review and cost estimate are complete, submit the project design and cost estimate with your application.
3. Submit an application
Note: You must include project design and cost estimate, or come back to submit them at a later date.
To ensure the project is effective over time, it must be routinely maintained and the property owner will need to enter into a maintenance agreement with the city.
4. Application review and project approval
City staff will review the application for effectiveness in managing stormwater runoff, feasibility, overall design characteristics and eligibility for funds. During the review process, city staff will inform you if any permits are required to construct your project.
City staff will contact you with the project approval or comments after the application review is complete.
5. Construction
Complete the construction of your rain garden or other stormwater management project.
6. Inspection
The city will inspect the project to ensure it was built according to plan and functions as intended. The homeowner must contact city staff to set up inspection.
7. Funding reimbursement
Upon completion of the inspection and final approval, reimbursement for the project will begin. View the funding table in the funding tab to see how much funding your project will receive. It may take about two weeks to receive the reimbursement check.